This project was a prefabricated Computational Laboratory facility with associated utility infrastructure. The facility was 100% prefabricated in Greensboro, NC, shipped in eight sections, and constructed onsite. The 2-story structure is approximately 3,229 SF with approximately 1,614 SF designated for the data center. The first floor houses 24 cabinets at 18kW per cabinet and a small area for unpacking, preparing, and repairing equipment. The second floor houses the electrical and HVAC equipment.

General Project Information:

  • N+1 Design
  • 175-Ton Chiller
  • 1,000kW Backup Generator
  • UPS – Flywheel Design

As the construction manager, 35 North facilitated design team selection and program management while serving as liaison with end-user groups. We were responsible for establishing and implementing project controls including budget, schedule, quality, information flow, and maintaining project objectives. We ensured document conformance, commissioning, and project turnover met client expectations.

PROJECT VALUE
$3.5 Million

SIZE
3,229 SF

OUR ROLE

  • Construction Management

MARKET SEGMENTS

  • Data Center
  • Laboratory
Let us put our expertise to work for you

We’re excited to partner with you! Our business consulting services and expertise in construction and project management are second to none. Our success is driven by the decisions we make, the policies we implement, and how our employees are trained.

Ready to
get started?

Cost Estimation and Project Management - Contact 35 North

Ready to get started?

What our clients are saying